INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

What is the effect of changing stabilised base course layer(C2) to cru

What is the effect of changing stabilised base course layer(C2) to cru

What is the effect of changing stabilised base course layer(C2) to cru

(OP)
Due to shortage of appropriate materials which comforms to C2 requirements prior to stabilisation,I was obliqued to request for a change.Instead of using stabilised base of 150mmthick to use 150mm thick of crushed stone base.Granite rocks are plenty in the project area.The design traffic class in this project area is TCL-10(3-10)E80millions.The Client insisted that change should be accompanied with thick layers of crushed stone(CRR)materials.Instead of using 150mm thick to be 200mmthick.And laying the base course materials to be into two operations,means first layer to be 100mmthick compacted then to be followed with another layer of 100mmthick.Means total to be 200mmthick of crushed stone base.Is it appropriate method of construction?

RE: What is the effect of changing stabilised base course layer(C2) to cru

You've used a lot of apparently local or regional jargon in your requirements, so I'm not familiar with that; however, I'm guessing that your traffic requirements are moderate.  Given that, a 200mm base course is reasonable.  As for the granite, if it is "crusher run", meaning it is crushed and only scalped on the top size stone, it will create a stable base material when compacted.  

Placing the base course in two 100mm layers is a good idea, provided your top size of material doesn't exceed 40mm to 50mm.  If you have material that will exceed 50mm, then it is better to place in thicker lifts because the larger material tends to "punch" into the layer and loosen during compaction.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources