INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

2006 IBC Special Inspections (CH 17)

2006 IBC Special Inspections (CH 17)

2006 IBC Special Inspections (CH 17)

(OP)
I typically do residential work so I'm not too familiar with the permit rules for commercial projects.  

I'm getting ready to be the EOR on a public bathroom.  The building will be on wood piles in a high wind zone.  (a very basic rectangular building).  

1704.1.2 requires special inspections for the following (list of 7 possibilites)....included in this list is pile foundations (this building applies).  Understood, I'll have to get the piles inspected.  There's a table (1704.8)that makes this very simple.  It details what to check & how often.    This building does not meet any of the other requirements.  So I would think I've completed the inspection section.  Doesn't seem to be the case, though.

When you get to section 1705 it talks about the "statement of special inspections."  This includes a section about wind which would include this building.  1705.4.2 details what the statement should include.  It's actually pretty simple.  There isn't anywhere that I've seen, though, that discusses actual inspections or frequencies.  Do I just have inspections for the piles and include my high wind statement as a formality?

I feel like I'm going in circles - any advice, more resources other than just the code?  Thanks.

 

RE: 2006 IBC Special Inspections (CH 17)

eventually what city inspector / engineer wants will control. Give them a call

RE: 2006 IBC Special Inspections (CH 17)

Ditto - and you may be able to do the inspections yourself!

RE: 2006 IBC Special Inspections (CH 17)

Create your own "Special Inspection Plan" for the building and file it with the plans.  That way it will become a part of the plan approval process and will need to be done...and as Mike said, you could do it yourself, but in any case you are establishing the criteria and as EOR that's where you need to be.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources