INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

HEC RAS Model with pipe in cross section

HEC RAS Model with pipe in cross section

HEC RAS Model with pipe in cross section

(OP)
I have a project where there is a T intersection of two roads. There is a pipe that pics up the water for normal situations and carries it downstream along the north side of the road. In a high flow situation the water exceeds the capacity of the pipe and overtops the street and runs into a ditch along the south side of the road.

So my question is do I use a junction to split the flow? Is there a way to model a pipe or culvert that passes through multiple cross sections?   

RE: HEC RAS Model with pipe in cross section

I am not sure, but I do not think that the current HECRAS can model this situation.  Weir flow from the culvert scenario is placed at the downstream segment.  In the older versions of HECRAS I had to evaluate the weirflow externaly to determine the amount of weir flow being diverted.  You may want to try to evaluate with a rating curve; but, it would still need to be computed externally of HECRAS.  Maybe there is someone else that has found a way to model this in one HECRAS model.

RE: HEC RAS Model with pipe in cross section

NolanN,

Can you post a sketch, or two ?

RE: HEC RAS Model with pipe in cross section

Some dimensions, a North Arrow, a graphic scale, a direction of flow !, some indication of the roadway sections, the flow or flows to be analysed, cross sections of both the upstream and downstream reaches, the length of the "culvert", and estimates of Manning's "n" for the channels and overbank areas would all be needed before HEC-RAS, or anyone else can answer your question.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources