INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Stress analysis

Stress analysis

Stress analysis

(OP)
i am involved in a job in installing new MSV skid (2 already existing) where 16" bulk header is extended for a length of 15m. Will the pipe needs to be stress analysed? Design temp. 82 deg C. Rating 600#  

RE: Stress analysis

Probably not, but if you're asking the question then you need someone with experience in piping design and engineering to make the call.  How is it supported, what is the design pressure (xx0# ratings disappeared in the 1970's), etc etc. If something goes wrong, you need to consider what your testimony to the judge will be.

jt

RE: Stress analysis

(OP)
Thanks. We will be on a site visit for this job soon. Hopefully I can get more details about the situation.

RE: Stress analysis

Find out if the skid has hold-down clamps, some kind of anchor bolts, or will be tack welded to a deck, etc.

**********************
"Pumping accounts for 20% of the world's energy used by electric motors and 25-50% of the total electrical energy usage in certain industrial facilities."-DOE statistic (Note: Make that 99% for pipeline companies) http://virtualpipeline.spaces.live.com/

RE: Stress analysis

Uhhh... The ASME B31.3 Code requires ALL lines to undergo a flexibility analysis, period, unless the situation meets a couple of very unusual guidelines, which are listed.  Now, the analysis may consist of a 'qualified professional' rendering a judgment that no analysis is needed, but that in itself consists of a flexibility analysis.  The Code is clear on what constitutes a qualified professional.  

It is not correct to say a priori that this line, or any line for that matter, does not need a stress analysis.

Not sure what Code your system is under, but you better check that out first.  Pete

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources