INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

use of Treated sewage effluent for construction

use of Treated sewage effluent for construction

use of Treated sewage effluent for construction

(OP)
I have a situation where contractor is asking to use TSE water for compacting back fill material, the back fill is mainly sandy soil and is below a steel pipe rack. can any one help with the advantages and disadvantages of this action? are there any adverse effects of using TSE on soil  

RE: use of Treated sewage effluent for construction

Corrosion potential is higher, it will likely add sulphates to the soil which can affect concrete, and you might not be allowed to do so because of local or regional environmental laws (similar to effluent spray field application)

RE: use of Treated sewage effluent for construction

Sewage effluent is not going to be significantly more corrosive or have any more sulfates than the water supply that the water was initially sourced from

The only concern that you should have is for contact with the workers. The effluent water should be disinfected as a minimum requirement. You may have to filter the effluent in order to get proper disinfection.

If the effluent is not thoroughly treated, you may have some temporary odors.

RE: use of Treated sewage effluent for construction

It depends on the treatment process for the effluent. If it is only screened and chlorinated expect very high corrosion levels. if it has been membrane treated then BIMR could be correct.

RE: use of Treated sewage effluent for construction

The WWTP where they get this treated effluent must have a land application NPDES permit to discharge onto soil and this permit has a specific site where the effluent must be discharged.  I have never heard of a contractor wanting to use treated effluent for compaction and I have never heard of an NPDES permit that would allow the WWTP to provide a contractor with treated effluent to be used for compaction.  Doesn't sound right to me.   

RE: use of Treated sewage effluent for construction

Depending on the state, individual septage pumpers/haulers can get permits to dispose of the septage on fields after screening and treatment, usually adding lime.

Could be the contractor was going to make a few bucks by being able to dispose of it for a hauler.  

It would definitely need a permit.  I hope JECCNC said no unless there was a proper permit in place and the concerns above regarding corrosion, etc. were considered.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources