INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

temporary bridge

temporary bridge

temporary bridge

(OP)
Looking to design a temporary bridge to span a 15 ft. hole.  Have a 1" steel plate 4' x 8' and some hp 10x 42 steel piles.  If I use 3 piles per plate do I need to put some cross members in it or will the plate/pile system  carry a point load of 12500 lbs.

RE: temporary bridge

If the plates are welded to the HP sections for compression flange bracing and spaced 32" CC, (8 foot wide bridge), the stress from a 12.5 kip concentrated load at midspan will be less than 5.5 ksi.

RE: temporary bridge

Only if the piles are at least 15 feet long.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources