INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

design of pile mat
2

design of pile mat

design of pile mat

(OP)
would any one enlighten how you go about determining the thickness of crash concrete layer underlying existing subgrade to be used as the piling mat to support a piling rig.
what are the factors to be considerd
is there an softwere/program that is user friendly for solving these problem.

RE: design of pile mat

What is crash concrete?

RE: design of pile mat

And how can it underly the existing subgrade?

RE: design of pile mat

Design of working platform for rigs can be found on the site of the FPS (Federation of Piling Specialists ) in UK.

RE: design of pile mat

(OP)
Thanks BigHarvey, you have been very helpfull.
 

RE: design of pile mat

There is also a BRE based upon the FPS, referenced as BR 470, this includes working platform design for cohesive and granular sub-grades with worked examples. Unfortunaltey the methodology for incorporating geo-grids into the granular layer is not quite up to speed but does give a good indication of the likley [i.e. minimum] reduction in thickness through the inclusion of geo-grid/s into the mat. From experience, each supplier of geo-grid has a different methodology for 'proving' their material and design, and often they will warrent the design if you buy their material.  

RE: design of pile mat

BR 470 is the document indicated on the FPS website. We are talking about the same document ! We have also one under preparation in France but it is not yet public. BR 470 is allowing calculation of loads induced by the rig for each working phase ( the french document is not very good for that ) but the geotech calculations are more straight forward in the future french document. They boyh give similar thickness for the platform.  

RE: design of pile mat

(OP)
Again guys, thanks very much. you have made my life a bit easier.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources