INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Monorail Crane/Hoist Beam Markings

Monorail Crane/Hoist Beam Markings

Monorail Crane/Hoist Beam Markings

(OP)
I'm certifying some monorail crane beams for a customer.  The customer wants the rails (All I-beams) marked with the load capacity.  I've looked into the ASME B30.11 and B30.16 for the marking requirements but they only mention the actual lifting equipment (marking the hoists, lifting equipment etc.)  

Anybody know where I can find the spec for marking the actual beams, or if there is such a specification?

RE: Monorail Crane/Hoist Beam Markings


c2alpha,

In British Columbia we have it referenced in the Heath, Safety and Reclamation Code for Mines in British Columbia 2003 section 4.13.8 (2) "Permanent Signs: The safe working load shall be mardked on the load block and superstructure of hoisting equipment and shall be maintained in legible condition"

There is no mention of size of signs or any other detail other then "legible"

Don't think that my reference will help, but it may be a similar issue and you might need to check the local building codes or specifications.

 

__________________
Rob
"We can't solve problems by using the same kind of thinking we used when we created them." ~Albert Einstein

RE: Monorail Crane/Hoist Beam Markings

Check with OSHA and potentially state regulations.

Quote (1926.550(a)(2)):

Rated load capacities, and recommended operating speeds,  special hazard warnings, or instruction, shall be conspicuously posted on all equipment. Instructions or warnings shall be visible to the operator while he is at his control station.

jt
 

RE: Monorail Crane/Hoist Beam Markings

(OP)
Thanks Ya'll.  OSHA just says it has to be legible from the ground, so that's what I'm going to go with.   

RE: Monorail Crane/Hoist Beam Markings

It's good practice to mark your beams with the derated capacity if your hoist or hook is less than the beam capacity.  Just so there's no confusion and there's one rating on everything.  Or if you've got two trolleys on one beam I would put 2 X 20 ton, for example, so the operator knows the each hook's capacity and the total capacity.

ASME B30.2 might have some marking criteria as well but I don't have a copy.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources