INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Substation cost

Substation cost

Substation cost

(OP)
Just doing a preliminary budget estimate, I will look this up in my cost data book, but thought I'd like to see if some "real world" numbers will turn out close.  We don't design many of these, so we will be outsourcing the detailed design when we get to that point, but thought that some of you whom do this regularly would have a feel for a rough cost for one of these, (equipment only?-installed cost?).

We have a 34.5kV primary, 480y/277V, secondary, 3.75mVA indoor, oil filled substation with a 500A, secondary bus duct flange section and a primary fused switch.

Any ball park ideas in $US?
Thank you, EEJaime

RE: Substation cost

Need many more details to even throw any number out there. Many, many, more.  

RE: Substation cost

If you have to ask, you can't afford it.  winky smile

RE: Substation cost

Ask a vendor/ mfr rep in your are, SQ D, GE, Eaton or the like for equipment cost.

Need more info as to size, type and rating of the breakers.

Plus things like d/o, stationary, manaul or electrically operatred breakers, metering, automation etc.

And what do you mean by the installed cost, just the substation or its feeders etc?

Lot of variables. You will need to provide more info or outline spec to a vendor. For safe estimate add 50%- 70% for the installation "budget" in the eastern USA.

 

RE: Substation cost

May be I jumped the gun, by substation do you mean just the primary fuse-switch and the transformer?

If so the basic answer gets even better, ask a vendor! Much faster and more accurate.  For installation use Means.

 

RE: Substation cost

(OP)
Thank you gentlemen,

After I sent the post, I realized I had not provided sufficient information.  I was not getting responses from my  vendors in a timely manner, but did recieve the data subsequently.

Now that I've gotten the costs from the vendor, I will do the rest of the footwork as well.  Have a pleasant day/evening.

Regards,
EEJaime

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources