INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

high mast lighting / sq footing / cut rebar

high mast lighting / sq footing / cut rebar

high mast lighting / sq footing / cut rebar

(OP)
Am doing the special inspection work on new high school football stadium.  The high mast lighting was originally to be placed in deep augured holes but due to encountering rock several were redesigned and are to placed on spread footings.

The footings have # 5 @ 18" EW top and depending on the size of footings a specified number #6 EW bottom.  The drawing appears to show the pre-cast concrete mast standing vertically through both mats of rebar.  So the contractor simply cuts a round hole through both mats of rebar so that the mast can rest on the bearing elevation of the footing.

OK, not much weight, but depending on the number of lights lots of moment. But the # 6 bottom mat has a hole cut in it?  Does that sound right?

Just want a heads-up before I ask the EOR.



 

RE: high mast lighting / sq footing / cut rebar

If I understand correctly, the precast pole is to be embedded in the spread footing prior to concrete placement. If this is the case, it is correct to cut hole on the top steel mat, but I would set the pole at a distance above the bottom mat to ensure failure through punching shear or bending will not occur.
 

RE: high mast lighting / sq footing / cut rebar

I would assume that it's not correct, unless informed otherwise by the designer.

RE: high mast lighting / sq footing / cut rebar

Sounds funny to me.  

How is the attachment of the light pole made to the footing to develop the overturning moment capacity of the footing?  Sounds like the only link to the footing from the lightpole is through shear...  

Seems to me that rock bolts should be used here for better anchorage to the rockmass, in addition to the spread footing.   

Mike McCann
MMC Engineering

RE: high mast lighting / sq footing / cut rebar

(OP)
The pre-cast pole is to be placed through the two mats of rebar so that it rests on the dirt.  There is a circle of vertical hooked dowels around the base of the pole extending about 4 or 5' above the top of footing.  So there is a secondary concrete placement for what would look a lot like a pier in any other case.

  

RE: high mast lighting / sq footing / cut rebar

(OP)
Just FYI, the EOR advised that the detail had been misinterpreted and that the bars were not to be cut.  Just as we thought.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources