Dynamic Equations and Cohesive Soils
Dynamic Equations and Cohesive Soils
(OP)
On rural (resource) access roads in our local it is common to install pipe pile foundations for small simply supported structures (12m-21m) with a dynamic equation such as Engineering News (ENR). We are dealing mainly with cohesive soils and friction piles; the use of dynamic equations has lead to some very conservative designs. I'm advocating the use of a PDA at a minimum, but they can be hard to find in a remote location. Unfortunately re-striking is not a common practice, as the time suggested for set up (3-4 days) does not fit into the construction schedule (5-8 days for structure installation).
Any comments on the use of dynamic equations to predict the capacity of friction piles?
I've noted that the FHWA is advocating a modified Gates and Washington State has adopted their own dynamic equations, what has been the experience to date with these systems?
Any comments on the use of dynamic equations to predict the capacity of friction piles?
I've noted that the FHWA is advocating a modified Gates and Washington State has adopted their own dynamic equations, what has been the experience to date with these systems?





RE: Dynamic Equations and Cohesive Soils
The practice you describe is wasting money.
RE: Dynamic Equations and Cohesive Soils
I've got calls where they have 150-200 ft of pile in the ground and they're phoning to find out when they can consider it a friction pile. The only advice I could give is to get a PDA out to verify capacity or keep driving till you hit something. I was just wondering if anyone else had encountered this situation.
RE: Dynamic Equations and Cohesive Soils
When you have reached the computed depth as calculated by soil skin friction, stop driving and take a lunch break or other delay.
If you can wait longer than an hour, such as over night, fine.
Then count the blows for the first few inches, preferably the first inch. You can do this best if you attach a paper (on a board) to the pile and slowly draw a line horizontally, guided by a horizontal stick, free of the hammer effects. Allow for any changes in hammer energy, if you can.
It is very common to get a "fetch up"in soil support by waiting for excess pore pressures and other factors to stabilize. Most clays are somewhat sensitive to shearing and lose varying percentage of that strength when disturbed, to be regained later.