Moisture loss in S-O-G
Moisture loss in S-O-G
(OP)
I've been searching online for some guidance regarding moisture loss with respect to time for slabs-on-grade, but have come up empty. Am I barking up the wrong tree or just not finding it?
I am tyring to get an idea of how long from the time of the pour that you can assume a S-O-G is essentially done undergoing shrinkage due to loss of moisture.
I am tyring to get an idea of how long from the time of the pour that you can assume a S-O-G is essentially done undergoing shrinkage due to loss of moisture.






RE: Moisture loss in S-O-G
RE: Moisture loss in S-O-G
RE: Moisture loss in S-O-G
RE: Moisture loss in S-O-G
miecz- Thanks!
RE: Moisture loss in S-O-G
RE: Moisture loss in S-O-G
RE: Moisture loss in S-O-G
RE: Moisture loss in S-O-G
RE: Moisture loss in S-O-G