INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

PWHT SOAK TIME CALCULATION

PWHT SOAK TIME CALCULATION

PWHT SOAK TIME CALCULATION

(OP)
Pressure Vessel 100mm thick + 3mm thick SS cladding.

For calculation of the soak time does the 3mm thickness need to be taken into account?

e.g. calculate soak time on 100nmm or on 103mm?

RE: PWHT SOAK TIME CALCULATION

You need to review UW-40, specifically UW-40 (f) in ASME Section VIII, Div 1.

RE: PWHT SOAK TIME CALCULATION

roca,

please correct me if I'm wrong, but pwht is the heat treatment for the welds of the base metal.  On this basis, code PWHT requirement, which exludes process consideration, is entirely on the thickness of the base metal joint for the type of metal in consideration.  Hence, the soak time does not consider cladding thickness or W.O. thickness.  That is my experience on the equipments I've done (including Cr-Mo thickwall vessels), so far.  Others may know more.

RE: PWHT SOAK TIME CALCULATION

Can I just ask what difference it makes?  100mm = 3.93" and 103mm = 4.0", either way, 4" would be used, wouldn't it?

I believe if the vessel was designed with cladding strength calculated in the stess values, then it is part of the vessel thickness and must be accounted for.  Most vessels are designed without doing this, so it is typically only the thickness of the base metal uncladded which is used.

RE: PWHT SOAK TIME CALCULATION

DVWE,
cladding strength is never included in the base metal strength.

RE: PWHT SOAK TIME CALCULATION

vesselguy,
Have you read part UCL?  Perhaps you can enlighten me...

RE: PWHT SOAK TIME CALCULATION

(OP)
Thanks Guys

vesselguy - yes the SS is for corrsoion purposes only and the PWHT os for the welds. I have never before added the cladding thickness to calculate soak times, someone here in the office questioned it.

DVWE - I agree with vesselguy in that cladding strength is never included in the base metal strength and I have never worked for an end user who has wanted it any other way despite what part UCL states.

RE: PWHT SOAK TIME CALCULATION

Neither have I, but something to keep in mind.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.