INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pile load test

Pile load test

Pile load test

(OP)
Hi colleges,
I am trying to find suitable load test method for auger cast pile bearing on sand and granular material. and the piles were designed for skin friction and endbearing. throughout the pile lenth we mainly have sand and silty san mix.
I have suggested Cyclic method but the contractor wants to go with quick test method, and based on ASTM D1143, I think we can compromize to Maintained test method.
If anybody had experienc please advise me.
I really appreciate your help.

RE: Pile load test

Use D1143, load it in 4 increments to 2x design, hold 24 hours, decrement in  2 decrements, check rebound after 24 hours.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources