INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Loading for Helipad on Building

Loading for Helipad on Building

Loading for Helipad on Building

(OP)
Does anyone know anything regarding this or any references which can guide me as to what I should anticipate for loading from a helipad on a building. I know I should account for the weight of the helicopter, but also I imagine there should be both upward and downward wind forces plus some additional dynamic loading from landing... including possible "rough" landings.

I'm hoping theres just a PSF value for both downforce and uplift...

Thanks!
Tyler

RE: Loading for Helipad on Building

RE: Loading for Helipad on Building

(OP)
Thanks! The 5390-2b.pdf is really useful!

RE: Loading for Helipad on Building

do a google search on this forum and you will find this question has been posted previously.

  Google search for "helipad"

RE: Loading for Helipad on Building

In the third link on page 12 I noticed that in the interior circle of the landing pad the weight limit of the pad structure is to be posted.  To me that implies that the design load should be the weight of the choopper that COULD be expected to land there.  That will take some coordination with the client.

In addition, I would not use less than 25% impact and 10% lateral load during landing - similar to crane loads.

Mike McCann
MMC Engineering

RE: Loading for Helipad on Building

(OP)
Didn't even know you could do that... I'll be using that more in the future instead of just posting first. Sorry bout that!

RE: Loading for Helipad on Building

(OP)
So basically what I am doing is I have this existing building that was grossly overdesigned in anticipation of heavy mechanical loading and roof garden areas that were never placed and now they are considering possibly placing a helipad instead...

They want to know if its possible to do without any structural changes.  I don't think it's going to fly-no pun intended :), but I thought I'd take a look into it.

The existing structure might be able to support the static loads, but I'm really more concerned about deflection problems and those pesky impact and dynamic loads...

Thanks!
Tyler

RE: Loading for Helipad on Building

To avoid the impact loads, just don't allow the chopper to set down...

Mike McCann
MMC Engineering

RE: Loading for Helipad on Building

The total load will remain constant with the concentrated load able to load any fraction of the pad.  Helicopters are usually relatively light, (less than 15 kips for the big single rotor ones).

RE: Loading for Helipad on Building

We did one similar to yours about two years ago. We built a steel and aluminum frame on top of an existing old steel framed building. We accounted for 1.5 times the weight of the helicopter applied as point load, line load and as a pressure. Remember, the wind pressure generated at landing and take-off is only slightly greater than that needed to counteract the weight of the helicopter.   

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources