Looking for Wire Routing Options in 2008
Looking for Wire Routing Options in 2008
(OP)
All,
I just recently did an assembly where I need to draw in the wire routing. This is the first time I've looked for this functionality in SW2008. I know that in earlier versions there was an add-in that came with SW Premium, that provided wire routing. Can someone give me some guidance
Regards,
Rich.....
I just recently did an assembly where I need to draw in the wire routing. This is the first time I've looked for this functionality in SW2008. I know that in earlier versions there was an add-in that came with SW Premium, that provided wire routing. Can someone give me some guidance
Regards,
Rich.....
Richard Nornhold, PE
http://www.ovenind.com






RE: Looking for Wire Routing Options in 2008
If you simply dont have the time and resources to go the add-in way, you're going to have to create the routing using sweeps. The level of detail which you create these sweeps is up to you.
SW2008 Office Pro SP4.0
Intel Core 2 Duo CPU
2.2GHz, 2.00GB RAM
QuadroFX 3700
SpacePilot
RE: Looking for Wire Routing Options in 2008
Dan
www.eltronresearch.com