INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

AWS D1.1: Qualification by testing VS Procedure Qualifcation Record

AWS D1.1: Qualification by testing VS Procedure Qualifcation Record

AWS D1.1: Qualification by testing VS Procedure Qualifcation Record

(OP)
In AWS D1.1 welding procedure qulification, what is the difference between the Qualification by tesing and Procedure Qualification Record (PQR). It looks like they are the same.

Please advise, thanks.

RE: AWS D1.1: Qualification by testing VS Procedure Qualifcation Record

Can you elaborate on your question?

Both weldors and procedures must be tested.  PQR's are used to qualify a procedure to deem the welding variables acceptable, while personnel qualification is used to test the weldor's ability to perform a sound weld.

RE: AWS D1.1: Qualification by testing VS Procedure Qualifcation Record

sw007,
To qualify by testing you would need to perform a PQR. You are correct

RE: AWS D1.1: Qualification by testing VS Procedure Qualifcation Record

(OP)
I am reviewing a welding procedure which is supported by a document named "Qualification by testing", not "PQR". That's the reason I asked this question.

The variables in the WPS are specified based on Pre-qualification varaibles. I do not know why the vendor provided a tested report but still used the variables for pre-qualified WPS.

RE: AWS D1.1: Qualification by testing VS Procedure Qualifcation Record

sw007,
It sounds like you might be looking at a sample form in AWS D1.1 annex N. It is possible to have a prequalified and qualified by testing WPS with the same variables. It could be a typo that marked the form as qualified by testing accidental. I would ask the vendor for an explanation. Not having the ability to properly document a wps qualification raises a flag and I would want to investigate it further.

RE: AWS D1.1: Qualification by testing VS Procedure Qualifcation Record

(OP)
hogan666, Mr168

THANKS FOR YOUR REPLY.

RE: AWS D1.1: Qualification by testing VS Procedure Qualifcation Record

You could or can write a PQR and have have a welder use the parameters of same to make a product weld and if this weld passes both the welder and PQR are qualified/certified.

In the same vain you can write a PQR for a say an assembly line weld and weld it on the line and if the weld passes inspection again the welder and PQR are certified/qualified.

In both cases there isn't a separate qualifying weld for the PQR.
 

RE: AWS D1.1: Qualification by testing VS Procedure Qualifcation Record

The "Qualification By Testing" line is used to indicate that a WPS as indicated on the top was qualified by testing and NOT prequalified.

The PQR check box is used to indicate that the entire document is a PQR.

The form used to document the testing ranges may look exactly like the WPS except for having the test results and indicate that it is a PQR.

As an example the form shown at http://files.aws.org/technical/forms/N-1.pdf

If the top box is checked for "WPS" then one of the two lines below need to be filled in to indicate whether the procedure is prequalified or qualified.

If the check box for PQR is filled in then the record is a PQR and nothing above it should be selected and the back page will need tio be filled out with the test results.

Also in refernce to qualification on production welds.

If you qualify a procedure the coupon, specimens and tests must conform to the requirements of D1.1.
 

Gerald Austin
Iuka, Mississippi
http://www.weldingdata.com

RE: AWS D1.1: Qualification by testing VS Procedure Qualifcation Record

(OP)
unclesyd, pipewelder1999

Thanks.

If line "Qualification By Testing" is checked, the welding Procedure qulification shall follow AWS D1.1 Section 4 using the parameters for the test coupon. Right?

RE: AWS D1.1: Qualification by testing VS Procedure Qualifcation Record

That is correct.

RE: AWS D1.1: Qualification by testing VS Procedure Qualifcation Record

"PQR" stands for Procedure Qualification Record.  It's the test report for the qualification testing.  So a PQR is part of the process of "qualification by testing".

(Yeah, I'm coming in late, but this seems not to have been stated explicitly in this thread so far.)

Hg

Eng-Tips policies:  FAQ731-376: Eng-Tips.com Forum Policies

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources