INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

LEED Core & Shell EA Credit 1

LEED Core & Shell EA Credit 1

LEED Core & Shell EA Credit 1

(OP)
What lighting loads have other mechanical designers used for a LEEDs Core and Shell program? I am trying to run my energy model but the electrical lighting loads will screw up the numbers. The core building "future area" has been designed with temporary lighting of 0.02 watts/sq. ft. I have 4 floors of 20,000 sq. ft. Each floor has 15,000 sq. ft. of unimproved future open space offices of unknown future lighting level. The balance of each floor has 5,000 sq. ft. of hallways and common areas that I will use the space by space method of baseline vs. proposed. I designed the building to carry 1.1 watts per sq. ft. lighting and 5.0 watts per sq. ft. misc. (as per a spec.).

According to the LEED-CS v2.0 Reference Guide:
"Core and shell buildings may not have all of the components addressed by ASHRAE/IESNA 90.1-2004 designed or defined.  For these types of projects, it is necessary to show compliance for the scope of work that is controlled by the core and shell team.  For example, if there is no lighting scope of work in the core and shell, the core and shell team need not demonstrate compliance with the lighting mandatory and prescriptive provision of the standard, but must show compliance with the other provisions."

Without a lighting load, my total energy load will be low and the potential energy saving rests more upon HVAC and thermal envelope.


 

RE: LEED Core & Shell EA Credit 1

Sounds about right. The only 'Core and Shell' projects I've done have had a base lighting load, which did nothing to help our energy model anyhow.

Do you use ASHRAE's Advanced Energy Design guide for Offices to meet/beat 90.1? I don't get involved with lighting design (other than to model it) but I've pointed lighting designers at the book for some energy tips.

RE: LEED Core & Shell EA Credit 1

(OP)
I do have ASHRAE's free Advanced Energy Design guide for Offices. Like you, we did not design the lighting or lighting controls. Today, we found a LEED credit interpretation request that ruled, if a lease hold restriction is in place for the TI of 1.0 watt per sq. ft., they could use a proposed of 1.0 vs. 1.1 in the baseline as per 90. I may go this direction.  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources