INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

retaining wall with keys

retaining wall with keys

retaining wall with keys

(OP)
How to design the retaining wall with keys?
- should the soil active pressure and surcharge load below footing to bottom of key be considered?
- has anyone designed the footing with 2 keys? if so, can i use the soil passive pressure at both keys for sliding?

RE: retaining wall with keys

A detailed drawing would help.  
Is this a flood wall?

Generally active pressures to not apply to keys;
keys typically resist sliding,
but may be modified to increase resistance to overturning and increase the length of seepage paths.  

Multiple keys may have overlapping zones of horizontal influence,
and the passive resistance should be calculated accordingly.   

RE: retaining wall with keys

Just a thought, but if the wall is so big that it needs multiple shear keys, perhaps it is the wrong type of wall.  Maybe a permanently anchored wall (tiedback or soil nailed) is more appropriate.  Or possibly the shear keys could be replaced by tieback anchors or piles through the footing.

RE: retaining wall with keys

I have never used 2 keys on a wall.  Would not making a single key deeper be more practical?

RE: retaining wall with keys

I have seen keys over the years, but have yet to really be convinced of their general effectiveness.  If the soil slip circle in front of the key is weaker that the ultimate passive resistance then relying on it is highly suspect.  My thought are to always consult a geotechnical engineer in these cases.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources