INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Curve number for large gravel area

Curve number for large gravel area

Curve number for large gravel area

(OP)
I will be preparing a stormwater management report for an industrial site (new construction) with a large gravel area. The area will be approximately 5 acres with a 12" depth. I was wondering what curve number you guys think would be best to use. I have worked on other projects before where I was instructed to use 98, the same as asphalt paving, and other times it has been lower.
Being that so much of the site will be covered with asphalt and buildings I would like to use a lower curve number, that is still accurate, for the gravel storage and parking areas. Any help you guys can give is much appreciated

RE: Curve number for large gravel area

Check if it's in the city/county or state drainage manual/guidelines.  If not, you could use the TR-55 values:

Gravel (including right-of-way),
HSG A/B/C/D RCN = 76 85 89 91 respectively

 

RE: Curve number for large gravel area

depends on what type of gravel and the amount of compaction or other treatment.

open graded gravel would have much less runoff than dense graded - compacted road base material. If your void space in the (open graded) gravel is 30%, you could infiltrate approximately 3.6 inches of rain before you get any appreciable amount of runoff at all.  With the dense graded aggregate (road base), I would agree it is about the same as asphalt. Especially if you have 95% compaction or if you use any sort of binders to stabilize dust, you could approach the 98 value.



 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources