INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Face mounted floor joists
2

Face mounted floor joists

Face mounted floor joists

(OP)
Older home with face-mounted joists that are pulling away from the main beam (ledger boards are rotating outwards) - my theory is that is from wood shrinkage and other ageing affects (ledger was also not supported at the bottom by the columns - causing some downward movement).

At any rate, I hope to get some ideas on a recommended repair. Any thoughts?

RE: Face mounted floor joists

2
looks like a steel beam packet out with 2x material with a 2X4 ledger nailed on to this.  If you have rotation then they don't have the 2x material packing out the beam bolted to the web of the I beam.

Is the system failing?  What are you trying to accomplish?  Chances are it has looked like this for some time now.

RE: Face mounted floor joists

(OP)
The beam is a wood (not steel) 6"x 8" (far right side of the photo).  2"x 4" ledger is nailed, but pulling out (rotation) at the top - abut 1/4" to 3/8" gap at the top.  Ledger has also moved downward slightly - hard to see in the photo, but the bottom of left side ledger is lower (no longer flush) with the bottom of the beam. Floor joist bearing has also been shortened as a result and some nailing has pulled out.

I agree that this has been in existence for some time.  However, the client is also in the process of replacing a section of this beam (other end) due to termite damage.  Saw these connections in the review and hope to come up with way of bracing.  The home will likely be put up for sale in the near future - an item that could be red-flagged in a home inspection.   

RE: Face mounted floor joists

How about cut the joist off 1-1/2" to get rid of the notch.  Nail a 2X8 to the side of the beam as a ledger sort of speak and use face mounted hangers.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources