INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Lateral loads on immature concrete

Lateral loads on immature concrete

Lateral loads on immature concrete

(OP)
Appreciate views,information and opinions on immature concrete subject to lateral loads.

The contractor has to install steel tubular piles for construction of wharf into rock sockets. The concrete specfied is 40 MPa at 28 days strength. The contract calls for the piles to be temporary braced. But the contractor wanted to release the braces after 7 days when the strength is around 25 MPa. This means the concrete is immature and has not reached its 95 % full strength. Question is will the concrete pemanently deformed if the lateral loads such as wave, current is excessive? Where can I source inform on strength of immature concrete?
 

RE: Lateral loads on immature concrete

American Concrete Institute address loads on immature concrete in their document ACI-347, Formwork for Concrete.
Typically, problems occur if the loads cause cracking.

Google Books has a preview of ACI-347. Fortunately, Section 5 - Loads & Pressures is complete in the preview. See the information starting on Page 5-18. Here is the link
http://books.google.com/books?id=0G9n7dfIvNEC&pg=PT111&lpg=PT111&dq=loads+on+fresh+concrete&;source=bl&ots=zSDcN7pZNz&sig=ji3-w051uhF9j0ykiG5aW-mG_wE&hl=en&sa=X&oi=book_result&resnum=1&;ct=result#PPT104,M1

For your situation, of course the easy answer is to tell the Contractor "NO". But, IMHO, that is not what engineering is about.  Take a look at the live loads that the wharf was designed for (perhaps ship mooring or impact?). If those loads are large compared to wave, current, etc. and will not occur while the concrete is curing, perhaps you can consider allowing the Contractor's request.

If your look at the numbers is encouraging, have the Contractor submit to you a detail plan of exactly what he plans to do (prepared by an independent Engineer, at the Contractor's expense).  If the plan is reasonable, accept it.

www.SlideRuleEra.net idea

www.VacuumTubeEra.net r2d2

RE: Lateral loads on immature concrete

(OP)
SlideRuleEra

I look up at the reference Formwork for concrete as recommended, it does not mentioned about loadings on young concrete. The book is more towards formwork and concrete pressure on formwork

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.