INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Belled piers

Belled piers

Belled piers

(OP)
Just wondering if anyone around the US still use belled piers (caissons)?   

RE: Belled piers

Yes. If that's what the geotech recommends.  

RE: Belled piers

I last used them at Fort Sill, OK, back in 2002. They drilled into some nice, stiff sandstone, I think, and worked fine.

RE: Belled piers

I've seen them specified in few soils reports through the years.  Seems like that was situations where they had possible heave from clay soils.  I remember calling one local pier-drilling company and talking to one of their estimators.  His summary:  "I hate belled piers with a purple passion."

RE: Belled piers

We use them a lot in Mississippi.  We have highly expansive clays and the bell piers help resist heave.   

RE: Belled piers

(OP)
Thanks.  I live in central Oklahoma and have not seen them used in the 15 years that I've been practicing.  Tried to specify belled piers when I first started as an engineer and found out quickly that drillers around here did not like the bells.  Have not tried to spec since.  Geotech reports do not specify bells, at least in the reports that I receive for my projects.  How are the bells inspected?   

RE: Belled piers

I have used them many, many places in the upper midwest. Use minimum straight shaft diameter of 30". Maximum bell diameter 3 times the shaft diameter. Very common for building construction!

RE: Belled piers

Here in NW Florida all our foundation piers at our site have bell hole bottoms. Most are 36" dia with a minimum 48" dia bell at 90' deep. Our soil here is sand and hard pan and the piers are setting on 100 or so ft of hard pan.

Anecdotal:

The best thing our construction people could see was the drilling company's drilling rig setting up on site at the close of a job. Several offered to buy them a trailer to camp out on site.

RE: Belled piers

(OP)
when belled piers are used in expansive clays, is the bell acting at a lug in the ground?  How is the capacity of the uplift resistance determined?  Any recommendations on texts for this problem?

RE: Belled piers

Yes, in expansive clays the bell serves to anchor the pier in the ground since the clays will, upon expanding, grab the pier and try to lift it.  

Most of the south Texas expansive clay projects I've worked on had belled piers with the geotechnical engineer providing guidelines on the required amount of reinforcing in the pier based upon pier diameter/surface area.

 

RE: Belled piers

(OP)
calculating the required reinforcing is not a problem, as I've done that with straight shaft piers socketed into shale or sandstone using skin friction.  I am not certain how to determine the uplift resistance provided by the bell itself.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources