INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Bonding between existing concrete slab and new overlay

Bonding between existing concrete slab and new overlay

Bonding between existing concrete slab and new overlay

(OP)
Client is requesting addition of new structure adjacent to existing building, by using the existing eight inch thick parking lot concrete pad, which slope away from existing
bldg. with difference of 8" in elevation from top of the slab to the lower part of slab, client wants to level the slab by adding 4" sand base and 4" new cocnrete mix to level the floor, slab is used for truck storage, with 6" minimum thickness requirement, my question is how does the new concrete will interact with existing in above formation or is best to use latex bonding on existing floor with 4" concrete above with out any sand base. any suggestion will be helpful. thank you
  

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.