INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

RT Before or After PWHT

RT Before or After PWHT

RT Before or After PWHT

(OP)
Does ASME Section VIII specify if RT is to be performed before or after PWHT.  I have searched and have not found information supporting either.

Thanks for your input,  I would like the code reference to your response.

WBH

RE: RT Before or After PWHT

WBH

RT in accordance with ASMe Section VIII may be performed before or after stess.

JR0097

RE: RT Before or After PWHT

code....either way
if customer does not have any specs contrary...we do it before.

I the client wants it after pwht per spec....we do it before and after

RE: RT Before or After PWHT

(OP)
Thanks

WBH

RE: RT Before or After PWHT

The above is always true for P1, but doesn't hold for all materials.  UHA-33

RE: RT Before or After PWHT

Why would you PWHT before RT?  If it fails RT you will have to PWHT again after you make the repair. Is there something I'm missing?   

RE: RT Before or After PWHT

Some USERS require all NDE to be done AFTER PWHT.  It's a written law in the specification.

Smart fabricators do all NDE before PWHT and then again after PWHT to meet specs.

Done every day all around the world.

RE: RT Before or After PWHT

RT is a lot cheaper than a PWHT.

Our specs call for RT prior to PWHT to detect volumetric defects unless it is a machine or MIG weld where we also require UT prior to PWHT. After PWHT we normally do UT checks to detect any cracking and usually do a few hardness checks. The hardness checks are just a test to verify that there were no material mix ups. The hardness checks have been mostly eliminated due to better PMI equipment.

In my 42 years I've never seen any problems  with P-1 material during and after PWHT.

RE: RT Before or After PWHT

syd

most HF services and hydrogen and Wet Sour services now require nde after PWHT.

we normally UT before (for or protection) and RT after

Cat D joints are UT before and after.


all P-1 material...yes a pain  but never a problem

RE: RT Before or After PWHT

As said above by weldtek , RT shall be done after PWHT for high alloy steels per UHA-33. This is because a delayed cracking or post heat treatment cracking may happened in or adjacent to welds after PWHT. This is not applicable to UCS steels. Common sense: you always need to do RT before PWHT to repair defects if any. Section VIII Div. 1 does not require RT after PWHT for carbon or low alloy steels.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources