INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

1200 ft. slip along an elevator built in 1929

1200 ft. slip along an elevator built in 1929

1200 ft. slip along an elevator built in 1929

(OP)
We are currently looking at at an elevator built in 1929-30.  Along one side of the elevator, 1200 foot long, is a slip built originally to unload ships via Marine towers  ... way to complicated to explain here.  Long story short we are currently considering adding 24,500 metric tonnes of storage along this slip in the form of 21' dia x 70 tall cold formed steel hopper bins.  The slip and for that matter the whole elevator is founded on timber piles.  Its about 10 to 15 feet of fill placed over about 40 feet of clay marl, then 15 feet of clayey silt transforming into 10 feet of silty clay ending up up as 5 feet of silty sand lastly about 3 feet of mixed sand glacial till finally bedrock.
Thoughts on how far they might have driven the piles in 1929?
The only info on the piles is they were supplied locally which likely would have meant white and red pine, hemlock perhaps, maybe even red oak? ....
No info on sequence, concerned about negative skin friction.
Perelim on analysis yields axial loads in the 25 ton per pile nieghbourhood, so is close, condition aside.  Thoughts?

RE: 1200 ft. slip along an elevator built in 1929

Pile driving in 1929 was done essenitally the same way as today. Other than simple drop hammers, most piling were driven using steam power. Many hammers used today with compressed were likely built before 1929 for use with steam. The equipment available was more than adequate to drive any timber piling until the pile itself failed.

IMHO, load tests on existing piling would be wise.

www.SlideRuleEra.net idea

www.VacuumTubeEra.net r2d2

RE: 1200 ft. slip along an elevator built in 1929

(OP)
SlideRuleEra:
Just finishing the reports conclusions on new steel structure under the bins and their distribution to achieve pile loads not greater than 20 tons range and have include testing of the piles and consolidation and other geotechnical testing as 'shall' do items as the next phase.

RE: 1200 ft. slip along an elevator built in 1929

I would test drive a few of the existing pile to see if there is any movement.  Might carry far more than you think after all these years.   Definitely a geotech's call here.

I have run into 18" diameter DF pile driven at the turn of the century that put 12" diameter, 25 ton steel pipe pile to shame.   

Mike McCann
MMC Engineering

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources