INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Pour concrete on high ground water level location

Pour concrete on high ground water level location

Pour concrete on high ground water level location

(OP)
Can anyone give me a suggestions, if i want to pour 32MPa concrete on high ground water level on the ground, what should i do, besides i put the liner inside the ground? Any other easy idea that we can make it or not?

Any suggestions will be appreaciate, thank you.


Ray

RE: Pour concrete on high ground water level location

A liner is not usually needed and could do more harm than good by trapping any excess water in the concrete mix.

Over-excavate and place good granular material, such as crushed stone, in the bottom of the excavation so that the concrete will not be placed on "mud".

Leave the top of this stone 3 inches lower than specified to compensate or the likely hood that the first concrete placed in the excavation will be contaminated by soil.

Keep the excavation pumped out with diaphragm pumps (mud-hogs) before and during concrete placement.

After the concrete has been placed, discontinue pumping and cure the concrete as usual.

www.SlideRuleEra.net idea

www.VacuumTubeEra.net r2d2

RE: Pour concrete on high ground water level location

(OP)
Thanks for your suggestion. By the way, As you mentioned about put good granular material at the bottom of the completion of excavation, how about if the ground is sandy ground with high ground water level with deep excavation?
 

RE: Pour concrete on high ground water level location

ray81 - If pumps can't handle the inflow, you may have to use a vacuum well point system. Before going to that, however, it may be worth digging a test pit to the required depth and seeing if pumps will do the job.

Many times, even if the water table is high and the soil is sandy, the steady state inflow of groundwater into an excavation is manageable with pumps alone.

www.SlideRuleEra.net idea

www.VacuumTubeEra.net r2d2

RE: Pour concrete on high ground water level location

SlideRuleEra is correct, it may be manageable with pumps alone.  What kind of flow are you getting when you pump it down?  You can use perforated drainage pipe around the exterior, to a well.  How deep is it?  If it's too deep for a suction pump you might want to get a submersible.  You can dig a hole in the bottom with a backhoe (bailing every other dip or so) and insert a perforated cmp and backfill around it with clean rock to put the pump (or suction hose) into.  

It depends on what you're going to build there as well.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources