INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

I-35 W Bridge opening

I-35 W Bridge opening

RE: I-35 W Bridge opening

I just got back from driving over it.

It looks a football field at times because of the 10 lanes and lack of traffic today.

The surface seemed to be a little coarse and rough for traction, but that should wear in quickly. Because it is comprised of concrete segments, there are few bumps that will probably be fine-tuned.

After working on bridge construction, the time frame (Decemeber/January or so start) was amazing even if there was minimum foundation preparation since it sits on good limestone.

The segements were cast on site in heated enclosures on a basic 24 hour scedule stating on a -20F day using concrete from a near-by ready-mix plant. I wonder how much of the $20 million bonus will be eaten up by the premiums and overtime to take advantage a the good summer weather that also helped.

True to the Minnesota tradition with two seasons (winter and construction), several lanes will be closed this week-end for fine-tuning and sealing. Some of the underside components are not coated yet and a low volume parkway under one end will open soon.

The MNDOT had a video camera set up to document the construction progress. This should be available on-line. Since I am local, I never saw it since I could always take a look in person and some photos. I was also able to take a couple of tours during construction as part of local professional organizations.

It is certainly a definite visual improvement and it should be interesting to follow the findings of the instrumentation. One thing that was interesting is that a de-icing system was installed, when the old after-thought system was one of the possible candidates of contribution to the loss of strength in the old steel bridge.

Dick

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources