INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Caltrans Type II Bored Pile and Connection to Column

Caltrans Type II Bored Pile and Connection to Column

Caltrans Type II Bored Pile and Connection to Column

(OP)
We are construction foundations consisting of 2,400mm diameter bored piles, 14,000mm deep. Bored pile terminates at ground surface. Subsurface materials are a thin layer of silty sand followed by mostly weathered tuff for the length of the pile so will use bentonite or Supermud for drilling fluid. A single rectangular rc column/pier is to be erected from the pile which requires the column steel to be inserted into the pile for a length of 3,400 to 4,000mm. The problem is how to do this without having to waste a lot of concrete in the overflowing process of removing the upper layer of dirty concrete during the bored pile construction. Bored Pile concept is based on the Caltrans Type II piles.

Project location is a high seismicity area (Manila, Philippines) for an elevated guideway as part of a LRT project so no splicing in the potential plastic hinging zone is allowed.

RE: Caltrans Type II Bored Pile and Connection to Column

Only the top two or three feet of the tremie pumped concrete needs to be disposed of due to contamination of the drilling mud.  This is standard and is not amenable to lessened volumes.  If you try for a lesser disposable volume, take surface cores of the pier concrete to prove the F'c strength beneath the columns.

RE: Caltrans Type II Bored Pile and Connection to Column

(OP)
The program suggested by the piling contractor is to remove the upper 300mm (1 foot) of the concrete to eliminate any weak/dirty concrete however I think it will be more like 600-1,000mm (2-3 feet). We will see shortly I guess.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources