INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Ground improvement support for PE pipe on mud soil

Ground improvement support for PE pipe on mud soil

Ground improvement support for PE pipe on mud soil

(OP)
Hi guys hope you can help me with this. We are to relocate the existing 375 AC pipe at the toe of the road batter by laying a new 400 PE mainline about 25m from its original location. The road will be upgraded into 4 lanes and the existing ground is mud soil about 2-4m depth. Here are my queries.
1. What is the best effective protection strategy in laying the new PE mainline
2. The AC pipe has been there for more than 30 yrs and it is expected that settlement has already been taken place but there are section in the road upgrade where immediate road approaches will cross over the AC pipe and that portion of pipe will not be relocated. How shall we protect them from the additional loading that it will carry. Will concrete slab be adequate enough to distribute the loads on the sides?

Help guys pls thanks  

RE: Ground improvement support for PE pipe on mud soil

Details are required for good answers.  Depth of cover over pipe? Class of bedding? Traffic loads?  Soil strength and classification?

RE: Ground improvement support for PE pipe on mud soil

(OP)
The road is a major highway linking most of the industrial warehouses and coal terminal plants within the industrial zone. It is projected to carry 15,000 AADT in 10-15 yrs time but currently the daily traffic is at 7,000 AADT. The depth of cover is 1.0m. Additional soils test is being undertaken at this stage.

RE: Ground improvement support for PE pipe on mud soil

I am curious what is the service?

RE: Ground improvement support for PE pipe on mud soil

(OP)
the service is a raw water mainline

RE: Ground improvement support for PE pipe on mud soil

While not presuming to make such decisions, I wonder in this day and time, assuming the buried pipe is basically pretty much accessible at the time the new road approaches are constructed, how many utilities would really want to build new civil engineering infrastructure over a section of old, rather shallow-buried asbestos cement water piping (ACP, it appears intended to deliver eventually potable water) encased in mud?  It might make more sense to improve the bedding/road base however necessary for like constructiojn under roads, and (carefully) also replace the ACP in that area as well at the time.     

RE: Ground improvement support for PE pipe on mud soil

(OP)
thks guys

the ACP is 30 yrs old which is really a bit old and to my understanding has already induce settlement due time and might as well be very brittle and any adjacent additional loads or lateral stress is unadvisable. Only a portion of which will be replaced around 2km and the new PE pipe will be connected back to ACP mains.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources