INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Augercast and Driven Concrete Pile embedment

Augercast and Driven Concrete Pile embedment

Augercast and Driven Concrete Pile embedment

(OP)
We do many jobs with driven concrete and augercast piles.  Our detailing has always shown the pile embedded 4" into the concrete pilecap and the bottom reinforcing 3" above that (for 7" total cover).  I believe it is more/less industry standard in FL.
It seems to possibly be dated back when piles did not have reinforcing into the cap and embedment was actually a problem (for tension and fixed-head condition).  Now all of our augercast piles have continuous reinforcing into the cap and our driven piles have reinforcement drilled and epoxied into the pile and embedded in cap.

Question:  For compression and tension piles, does a 1" embedment seem reasonable?  This lowers the bottom steel (better strut and tie) and creates shallower pilecaps.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources