INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

steam coil RT requirement

steam coil RT requirement

steam coil RT requirement

(OP)
hi all,

I'm currently specifying the radiographic requirements for the A106-C steam coils inside a steam boiler.  The boiler feed water/steam is inside the pipe and the flame is on the outside of the pipe, inside a refractory lined radiant section.   The last boiler our company purchased called for 100%RT of the radiant and convection coils.   I think 100% was called for previously may be due to thinking that what if the coil leaked then it may ruin the refractory and need to shut down the boiler for repair... and so on.   

I think we can save a bunch of money by calling out only 10% of welds, and 10% of each welder's work.   My thinking is this is in steam service and even if it leaked, no one will be hurt as the coil is inside the radiant box.   With a well qualified welder and a good QA/QC in the shop, there shouldn't be bad welds for these carbon steel shop welded pipe coils.  Hence, I feel justify that 10% RT should be good enough.  What does other experienced guys here thinks about this issue?  Thanks.

RE: steam coil RT requirement

vesselguy;
What is the diameter of the steam coil? The reason for my asking is that Section I Table PW-11 would apply. Did you review this table?

RE: steam coil RT requirement

I'll second metengr as far as checking against PW-11 first, along with any client requirements.  If your material is under NPS 4 or 1/2", then evaluate the guys in your shop.  

In theory, every "qualified" welder should never turn out any defects.  Unfortunately, there is often far less overlap between being a good welder and a qualified welder than one would hope for, and a "good" QC guy is often just as rare.  You can take RT records from prior jobs of the same type of component and use those as a reference to make your decision, or perform a small study on your next run.  Start out with 100% RT, then break it down welder by welder and compare reject rates to determine if the idea if feasible, and who/where improvements need to be made.

RE: steam coil RT requirement

(OP)
metengr and Mr168,
Thank you for your input.  Yes, I did checked PW-11 and it does not apply to my case because the coils are 3"-Sch80.  Hence, RT is up to the user to specify.

I just found a communicate between the previous fabricator and the previous team that bought the boilers.   the vendor said "in the past 100%RT was specified to look for "grapes" on the inside of the pipe welds.  Since our weld root are done with TIG this issue is no longer valid..."

I have never heard of the term "grapes" but I imagine it must mean some lumps of weldments projecting on the inside surfaces of the weld.  

 

RE: steam coil RT requirement

Grapes is a term typically associated with burn though, particularly on stick welded root passes.  If you run it too hot, the keyhole opens up, and you get a glob on the backside of the weld where the filler/molten base metal has collapsed inwards.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources