INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Steel roof deck with bar joists chord force transfer

Steel roof deck with bar joists chord force transfer

Steel roof deck with bar joists chord force transfer

(OP)
I have a one story 50' X 86' building with 22 ga type roof deck on steel bar joists at 5'-6" o/c and spanning 50 feet.  I designed the metal deck roof deck diaphragm and it can tranfer the lateral loads to the shear walls on each end.  My chord force for the diaphragm is 4.2 kips.  I am using the steel roof beam at the perimeter of the building to act as the chord member.  How do I check the tranfer of the chord forces from the roof deck to the steel bar joists into the steel beam?  Can the force be transferred directly from the deck to the joists to the beam (every 5'-6"o/c) or do I need a continuous angle secured to the deck and beam?  The roof joists sit on top of the roof beam leaving a 2 1/2" gap between the top of the beam and the bottom of the roof deck.

RE: Steel roof deck with bar joists chord force transfer

On the side of the building where the joists are perpendicular to the exterior wall, you would want to place a continuous steel angle (3X3 perhaps) across the top of the joists to serve as a continuous edge support and collector for the deck.

What we do is then add a 2 1/2" steel tube between the joists, perhaps every 3rd or 4th joist, to connect the angle to the supporting beam below, thus by-passing the joist seats.

I've seen where some engineers require the joist manufacturer to design the seats to take a certain orthogonal lateral load through their seats but I've not done this too much.

 

RE: Steel roof deck with bar joists chord force transfer

You need a continuous edge member so that your fastener spacing matches what your diaphragm requires (not just one every 5'-6"). Then some how you need that force to jump down to the beam level. Since you have a small building, here are two suggestions:

Provide a 2.5" x 2.5" tube or inverted angle welded to the beam between joists that the deck can get welded to.

Provide angle on top of the joists to weld deck to and then specify required joist rollover resistance to transfer force from top of joist to beam.

RE: Steel roof deck with bar joists chord force transfer

FYI, joists are designed with a "rollover" capacity. You may not need to add the collector as JAE suggested, although I'd say it's a good idea.

The numbers I have are 1K allowable rollover capacity for a 2 1/2" seat and a 0.5K rollover capacity for a 5" seat.

So you would not technically need the collectors between joists if your service diaphragm shear is <182 PLF (at 5.5' spacing). I guarantee you this is not sufficient capacity in most cases. Still need to add collectors.

RE: Steel roof deck with bar joists chord force transfer

One thing to be careful of with a 2.5" x 2.5" tube and the deck running parallel to that tube is that there is no guarantee that the bottom of a deck flute will line up over the tube and allow an attachment.  Wouldn't a wider tube than 2.5" be better?  For a type B deck, the flutes are 6" o.c.   

RE: Steel roof deck with bar joists chord force transfer

Based on my own quick calculation of your situation, I don't think you need the collectors.  Using your chord force of 4.2 kips, the maximum shear to be transferred should be 195 plf.  With a 5'-6" joist spacing, your rollover force will be 1.07 kips.  As I recall, Canam says their joists are good for 1.8 kips rollover.

DaveAtkins

RE: Steel roof deck with bar joists chord force transfer

(OP)
Thanks for your replies.  How do you calculate the shear transfer force to the chord remains my question.  Is it (2 x chord force/length of the chord) or would VQ/It apply?  The building was recently erected and when I went out to look at it, the transfer of the shear force to the chord accross the bar joist it got me thinking.  There is no angle installed at the time.   

RE: Steel roof deck with bar joists chord force transfer

Reason it out! The chord force is zero at the end and a maximum at the center, so you have a half a chord length to transfer that force. Unit shear = F/(L/2).

Make sure your beam to column connections can transfer the chord force across the connection.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources