INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Bridge Foundation Scouring Please HELP!!!

Bridge Foundation Scouring Please HELP!!!

Bridge Foundation Scouring Please HELP!!!

(OP)
I have a small 32 foot bridge with some minor bridge scouring. Before the bridge gets scoured anymore I am looking at placing concrete around and underneath the bridge footings. I will lower the water level to try first but if unsuccessful I then will try underwater concrete bags and place them in the scour spots.

Does this sound reasonable to everyone here, I am a young Engineer and this seems the most practical to me. If you have any other ideas please throw them out there.

RE: Bridge Foundation Scouring Please HELP!!!

How you will place concrete under the footings. To reduce scour you should place riprap stone above the soil surface, thickness of which you have to calculate based on reduced scour depth. It's more durable and a permanent solution.  

RE: Bridge Foundation Scouring Please HELP!!!

Extending concrete down can sometimes just lead to extending the scour as well...

I think ali has a good recommendation with the riprap (I would call it gabion cages);  Essentially these are galvanized steel cages filled with rocks.

Alternatively you can dig a trench down stream from the piers (normally about two times the river depth- This assumes a fairly shallow river), and optionally fill this with large boulders.  This causes the rocks to build up and effectively re-buries your piers...

There are much more experienced bridge engineers around than I;  Hopefully someone chimes in with an easier solution!

Cheers,

YS

B.Eng (Carleton)
Working in New Zealand, thinking of my snow covered home...

RE: Bridge Foundation Scouring Please HELP!!!

As a rule of thumb, take a survey of the channel and observe the largest material you see deposited in the riverbed, usually on the inside of a bend in the river/stream.  Mesure this material and supply rip-rap for your site that is at least 1.5 times this size.  In this way, you supply rip-rap that won't be sent downstream next Spring.

Determine the proper channel size through your bridge area.  You may have to go with your best estimate of the historical profile.  Place the rip rap several feet above and below the crossing on each bank to a depth approximately twice the size identified earlier.

You will almost certainly need a permit from someone before you can do this work.  You will have to show that your proposal will not change the flow nor back up the water at your site.  Because of this, you will probably have to get soemone involved that really knows how to run the HEC software.  Good Luck.

RE: Bridge Foundation Scouring Please HELP!!!

you need to get an engineer on the project with bridge scour experience as this is a specialized area that most engineers do not have experience with.  This is a high risk structure and expensive to repair and you will want to do it right the first time.  You could gain a little knowledge by reading the following references and others available at the link below:

USDOT, 1995b. Evaluating Scour at Bridges, Hydraulic Engineering Circular No. 18, Federal Highway
Administration, FHWA-IP-90-017, 3rd Ed.
  
Richardson, E.V., D.B. Simons, and P.F. Lagasse, 2001, "Highways in the River, Environment," FHWA NHI 01-004, Federal Highway Administration, Hydraulic Series No. 6, Washington, D.C.

http://www.fhwa.dot.gov/engineering/hydraulics/library_listing.cfm

RE: Bridge Foundation Scouring Please HELP!!!

Scour is a function of velocity. Lower the velocity and lessen the scour possibilities.  Increase the cross-section area available for flow under the bridge at each water elevation by shaping the slopes or adding a parallel culvert.   

RE: Bridge Foundation Scouring Please HELP!!!

yes, velocity is a major component, however there are many more.  It is also related to:

depth of flow
diameter of piers
geometry and configuration of piers and abutments
channel geometry such as bends and constrictions
grade controls downstream or upstream
soil types
natural armoring or lack of armoring
vegetation
flow duration

 

RE: Bridge Foundation Scouring Please HELP!!!

Of the list of factors affecting scour, which may be modified after the bridge is built to lessen scour?  Only two, armoring or velocity, are amenable to change in the post constructed bridge.  the others need to be considered in initial design.

RE: Bridge Foundation Scouring Please HELP!!!

all should be considered during your scour mitigation project as they  may have a large affect on the design of your scour protection or mitigation.

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources