INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Annular Plate inspection

Annular Plate inspection

Annular Plate inspection

(OP)
The design for a 102 foot diam. open top tank with fltg roof does not require an annular plate. Due to construction of a new concrete foundation, an annular ring type design of A 516-70 is used to allow use of A 36 floor plates. The junctions of the annular ring will be a combination of single and double welded butt joints. Because it is not "required" is RT of the joints @ 10% of the double welded or 50% of the single welded or none at all, required?

RE: Annular Plate inspection

API Standard 650 requires RT of the seams of an annular ring whether the ring is required or optional.

Joe Tank

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources