INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

API 650 11th Edition - Seismic Anchorage

API 650 11th Edition - Seismic Anchorage

API 650 11th Edition - Seismic Anchorage

(OP)
Hello,

API 650, 11th Edition, Section E.6.2.1.2 has equations for seismic anchorage.  However, Section 5.12 in combination with Table 5-21 has equations for seismic anchorage as well.

The question is, how have you approached the two conflicting equations?  Do you look at both and use the most conservative number? Or...?

Also, when a tank is not required to have seismic anchorage (J <= 0.785), but anchorage is required for wind, do we need to look at the seismic uplift equation in Table 5-21? Or do we just look at the equations that are requiring anchorage (i.e. wind in this case)?

Please help!

Thanks!

RE: API 650 11th Edition - Seismic Anchorage

I have assumed that the newer equations were intended to take precedence over the old; that revisions were made but that other revisions required to match them were not made.

You can download a draft version of Rev. 1 from API's website and see if any of this is proposed for update.

Generally, the equations should give similar answers.  The anchor uplift is just based on Mc/I - P/A cast into various forms.

If a tank requires anchors for wind or pressure, you should still size the anchors and chairs for seismic load, even if seismic load by itself would not require anchors.

RE: API 650 11th Edition - Seismic Anchorage

Keep an eye out for the first addemum to API-650 (due out any day now they say?).  It corrects a bunch of errors in Appendix E and adds a commentary(a new Appendix EC).

Joe Tank

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources