INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Trench Drain Foundation

Trench Drain Foundation

Trench Drain Foundation

(OP)
For typical 8-12" wide pre-fabbed trench drains, do you normally put joints along the length (this one is 120 ft long) or just reinforce it and let it crack?   

RE: Trench Drain Foundation

Construction joints every 40 ft or so would be fine.  Letting it crack probably works too.  You can go either way and probably be okay.

RE: Trench Drain Foundation

Im from Australia and here we just lay the drain on a bed of granitic sand.  You guys place the drain on a concrete foundation ?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources