INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Procedure for digging buried offshore pipeline
2

Procedure for digging buried offshore pipeline

Procedure for digging buried offshore pipeline

(OP)

I am looking for any opinion on how to dig an offshore buried pipe in order to conect another pipe to it.

Does anyone knows an standard, book, manual, paper, web page dealing with this topic?

Any info will be really apreciated.

Chavita.
Mexico.

RE: Procedure for digging buried offshore pipeline

Excavation for pipeline depends on the water depth, soil type and extent of excavation required.

For excavation around an existing pipeline for tie-in of a new pipelinie, you could mostly likely adopt jetting if the soil is loose. Your procedure needs to take care not to damage or loose stability due to soil liquefaction. You might need additional stabilization outside of the excavation zone prior to start of excavation.
 

Narendranath R
Pipeline engineering is made easy with state of the art computer software, visit www.narendranath.itgo.com.

RE: Procedure for digging buried offshore pipeline

1- Pipe location to be confirmed.
2- Machine diggig to start from somewhere close to the pipeline and not over it.
3- Durring digging, pipeline locator should be used to confirm the location and distance to the pipe.
4- When close to the pipe (approx 300mm, use hand dig to expose the pipeline.
5- When pipeline is exposed, machine diggin can safly be used for the rest.
6- For hot tap connection, all confiened space requirement to be met.
7- Depending on the soil type, safety messures to be considered. (eg shoring ...)
   

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources