INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Wind Induced Settlement of Piles

Wind Induced Settlement of Piles

Wind Induced Settlement of Piles

(OP)
Does anyone know of any work in connection with wind causing vibration that led to piles settling through loose to medium dense silty sands?

We have just withstood a storm that has led to some settlement damage on a house on a very exposed coast. The house was designed in accordance with the local code for wind sped, but the actual wind was about 1.5 times as great. This seems to have led to settlement of a braced pile.

Its almost a case of dry liquefaction caused by the sides of a house vibrating causing the piles to vibrate and this leading to settlement of the sand around the pile. The diagonal brace is connected to the pile that has settled, almost at ground level and we are considering if the wind action has been enough to use the brace almost as a jack-hammer to push the pile down.

Gareth Williams
Geotechnical Engineer,
Auckland New Zealand

RE: Wind Induced Settlement of Piles

IMHO, the most likely cause of settlement is piling that do not have minimum embedment (typically 10 to 20 feet, depending on soils). Considering that the pile loads on most (residential?) houses is very low, I doubt if significant settlement would have happened for another reason.

Properly driven piling in other structures that are subject to vibration (such as bridges) rarely settle even though they are carrying substantial loads.

www.SlideRuleEra.net idea

www.VacuumTubeEra.net r2d2

RE: Wind Induced Settlement of Piles

(OP)
Thanks fr the reply. There is a layer of loose to medium dense sand about 4m thick that our slope stability analysis indicated did not have an acceptable FOS (i.e. < 1.5)The piles extneded to approx 8m bgl.

As the sides of the building rise approx 6m above the ground, there woudl have been significant wind loading and this woudl not have been constant, hence we are wondering if this vibration has led to densification of the sand around and below the pile. The action of the brace possibly has intensified the effect on the pile. The structure is suported by a number of other piles and none of these show signs of settlement (at least to the degree that this one does), but none of the others are braced either.

Gareth Williams
Geotechnical Engineer,
Auckland New Zealand

RE: Wind Induced Settlement of Piles

Madziwa, the scenario you are discribing is plausible, however, I have to agree with slideruleera that had the pile been with enough embedment in competent soil, I doubt you would have had this settlement.  

It is hard to give a constructive opinion without additional data.  We know that the upper 4m are made of loose-medium sand, what about the next 4m, what kind of SPTs do you have there?  Your statement above indicates setllement of the soil around the pile hence "downdrag" which is physically different than the "sinking" induced by liquifaction.  I guess what I am trying to convey is that you might have only downdrag on the pile induced by the settlement in the upper 4m and this would be the likely cause if the lower 4m of the pile are embedded in competent soil.  However, if the lower 4m are not dense to v.dense sand, you would expect the settlement to come from the overloading due to down drag and the loss of carrying capacity of the soil in the lower 4m as well due to liquifaction.  

RE: Wind Induced Settlement of Piles

Vibratory hanmmers operate at 16-2400 Hz. I sasincerely doubt that any storm could generatea resonate frequecy to sink a pile. I would suggest the timber piles were driven to length based on a test pile and one pile did not fetch up completely. During the storm, wind pressure increased to near desisgn values and the pile was overloaded. If wave action was associated with the storm, high water in a sandy soil will reduce effective stresses, further lowering capacity. I would suspect that pile for one reason or another had marginal capacity and was overloaded during the storm.
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources