What is required on shop drawings for code piping?
What is required on shop drawings for code piping?
(OP)
This is my first post.
When replacing a short section of coded (B31.1) pipe which is to be shop fabricated, how much weld detail should be put on the shop drawings? Is it sufficient to state to which standard it is to be fabricated by or does each weld need to be detailed out as in an ASME Pressure Vessel drawing? Also should any calculations be performed if the section is being replaced with no changes.
Thanks!
CAP
When replacing a short section of coded (B31.1) pipe which is to be shop fabricated, how much weld detail should be put on the shop drawings? Is it sufficient to state to which standard it is to be fabricated by or does each weld need to be detailed out as in an ASME Pressure Vessel drawing? Also should any calculations be performed if the section is being replaced with no changes.
Thanks!
CAP





RE: What is required on shop drawings for code piping?
Purchase a good book on piping drafting from AMAZON.COM.
Take a trip to your local long-established piping fabricator, look for the old guy in the corner (the one without the mullet and tattoos) and ask to see some typical working drawings.
If your replacement spool is an exact "replacement in kind", no calculations are required.....IMHO
-MJC
RE: What is required on shop drawings for code piping?
CAP
RE: What is required on shop drawings for code piping?
The piping related books offered by Gulf Publishing are particularly good for the "newbie".
I speccifically like the books by "Rip Weaver"....but there are others.