Hand rail embedded in concrete with sleeve
Hand rail embedded in concrete with sleeve
(OP)
Does any one know where to find info / literature on designing an embedded railing post in concrete that has a sleeve? typically I have seen posts embedded 6 inch in concrete that has been core drilled with a grouted sleeve in the hole. Are there any guidelines as to minimum depth, or any design guidelines?
Thanks
Thanks






RE: Hand rail embedded in concrete with sleeve
I don't know of any code but check out page 3 of the link below. The procedure is similar to the PCI manual for steel embedments.
http:/
RE: Hand rail embedded in concrete with sleeve