INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

equipment and labor cost escalation

equipment and labor cost escalation

equipment and labor cost escalation

(OP)
Need suggestions on equipment and installation escalation for 1/2006 to 6/2008 , are there any public forums to get data ?  

RE: equipment and labor cost escalation

Good luck getting something even approximately accurate, beyond simply using the CPI off the back of Chemical Engineering magazine...

Materials costs have been extremely variable over the past few years.  And labour cost is entirely regional.

RE: equipment and labor cost escalation

CEPCI for Jan 2006 final was 478.6
CEPCI for Jan 2007 preliminary was 509.8
CEPCI for Jan 2008 preliminary was 530.7
That is the latest I have.
This is the index from the back of Chemical Engineering magazine to which moltenmetal refers.

HAZOP at www.curryhydrocarbons.ca

RE: equipment and labor cost escalation

(OP)
thansk , I get chem engrg for free so I can't get at the old indices , interested in piping, and labor escalators  

RE: equipment and labor cost escalation

CEPCI for Jan 2006 pipes,valves, fittings 655.9, labor 304.3
CEPCI for Jan 2007 pvf 724.9, labor 310.8
CEPCI for Jan 2008 pvf 743.8(both prelim), labor 314.0

HAZOP at www.curryhydrocarbons.ca

RE: equipment and labor cost escalation

Your best bet would be to contact local fabricators and construction groups in the area to have them provide some rough costs and escalation factors.  Most are very helpful and will share info when it is available.

RE: equipment and labor cost escalation

Steel pricing is unpredictable, in Aus we have just had another 30% increase. It makes the escalation estimation look silly when there are predicted increases of that order!

Mark Hutton


 

RE: equipment and labor cost escalation

Just about all of the base metals went through conniptions in the past three years.  30% is nothing- but then again, I remember days not that long gone when steel was so steady in price (and so cheap) that there was no need to get quotes.  

For the past several years, our vendors have been quoting 7 day validities for anything with a significant materials content.

So you can use the CPI crap on the back of Chem Eng magazine if you want, but take it with an appropriate measure of salt.  I suggest that you'll be looking in the garden shed rather than the cutlery drawer for the correct measure...

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources