INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

calculating design peak flows at ungaged rural watersheds

calculating design peak flows at ungaged rural watersheds

calculating design peak flows at ungaged rural watersheds

(OP)
Looking for reference information for calculating design peak flows at ungaged rural watersheds? i.e. texts, reports, etc...

RE: calculating design peak flows at ungaged rural watersheds

HI
I AM TRYING TO MAKE THE HEC RAS MODEL WITH BRIDGE FOR BACKWATR ANALYSIS. ANY OF GUYS COULD HELP ME HOW TO BUILD THE PERFECT MODEL. IF THE SITE IS UNGAUGED, THE FLOW COMPUTED FROM RATIONAL METHODS WORKS OR NOT PLEASE LET ME KNOW. THIS HELP WILL REALLY BE COOPERATIVE FROM YOU GUYS. IF YOU HAVE SAMPE EXAMPLES PLEASE SEND ME. THANKS.  

RE: calculating design peak flows at ungaged rural watersheds

HI
I AM TRYING TO MAKE THE HEC RAS MODEL WITH BRIDGE FOR BACKWATR ANALYSIS. ANY OF GUYS COULD HELP ME HOW TO BUILD THE PERFECT MODEL. IF THE SITE IS UNGAUGED, THE FLOW COMPUTED FROM RATIONAL METHODS WORKS OR NOT PLEASE LET ME KNOW. THIS HELP WILL REALLY BE COOPERATIVE FROM YOU GUYS. IF YOU HAVE SAMPE EXAMPLES PLEASE SEND ME. THANKS.  

RE: calculating design peak flows at ungaged rural watersheds

I would say no - rational method is normally not sufficient for bridge design. Regression equation might be better

RE: calculating design peak flows at ungaged rural watersheds

(OP)
Thanks for the information, unfortunately the site I'm assessing is in Canada and the NSS program is not applicable.

RE: calculating design peak flows at ungaged rural watersheds

Are there no Canadian equivalents, really ?
Are there no regional regression equations applicable in Canada ?
Are there no such things as the National Weather Service, University Libraries, local government agency offices, Flood Insurance agents, Provincial or Territorial Environmental agencies, or public libraries ?

RE: calculating design peak flows at ungaged rural watersheds

Phliosphy,
Please start a new thread.  

RE: calculating design peak flows at ungaged rural watersheds

THANKS FOR SUGGESTION
ACTUALLY IT WAS MY MISTAKE. SORRY FOR THAT.
 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources