INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Electrical Design Approval From Agricultural Engineers???
2

Electrical Design Approval From Agricultural Engineers???

Electrical Design Approval From Agricultural Engineers???

(OP)
In one country, some Professional Agricultural Engineers were given authority to sign and seal electrical plans associated with Agricultural Design. There is a clause in their engieering law that includes Farm Electrification  and Energy Systems.

I am not happy with the way this law was enforced since I am always under the belief that all electrical designs involving farm electrification should be designed, approved and supervised by a licensed Professional Engineer. An Agricultural Engineer should only provide his approval on the premise of the Agricultural Process only and any Agricultural equipment.

I wouild like to invite any comments and suggestions from professionals regarding this practice in one part of this world.  

RE: Electrical Design Approval From Agricultural Engineers???

(OP)
BTW, I meant "...supervised by a licensed Professional Electrical Engineer."

RE: Electrical Design Approval From Agricultural Engineers???

which country?

RE: Electrical Design Approval From Agricultural Engineers???

(OP)
Philippines

RE: Electrical Design Approval From Agricultural Engineers???

Some states in the US have Agricultural Engineering as a PE category.  They are supposed have enough electrical knowledge to do design of simple systems related to farm buildings, etc.   

RE: Electrical Design Approval From Agricultural Engineers???

(OP)
Is there supposed to be defined limitations of the extent of electrical design work that they are supposed to do without any involvement from an Electrical PE? If residential designs (which are also simple as well) are checked and approved by PEs...why farm buildings are not under our electrical jurisdiction?

RE: Electrical Design Approval From Agricultural Engineers???

Most jurisdictions limit the size of electrical designs done by non electrical engineers -- but farms can get really big.  I would only be concerned for large farms.

Maybe it boils down to an ethics and professional competency issue that you should take to your professional engineering group (or maybe the body that issues electrical permits), if you are concerned about electrical designs made by the agricultural engineers.

RE: Electrical Design Approval From Agricultural Engineers???

This will vary state by state in the US.  In Oregon, no engineer is required for small electrical systems below 600 V designed by a master electrician.  This is not just for farms, but for residential, commercial, etc.  

 

RE: Electrical Design Approval From Agricultural Engineers???

(OP)
Thanks dpc and ykee for your responses. Dpc, if you say "small systems" below 600V, is there any defined parameters to say that this is "small"?

RE: Electrical Design Approval From Agricultural Engineers???

Up to 150 kVA.

The IBEW is pretty well connected in Oregon.  I don't like this exemption, but I will say that Oregon does actually license its electricians and provide some oversight that generally eliminates the grossly incompetent ones.   

RE: Electrical Design Approval From Agricultural Engineers???

(OP)
Thanks Dpc for the insight and information. If you have some suggestions that I would improve or at least avoid such overlap, I will appreciate to have them.

RE: Electrical Design Approval From Agricultural Engineers???

While I can understand having concern over designs not being made by an EE, you also need to take into account whether or not a design can be simple enough to be made by someone knowledgeable in the codes using standard parts (ie: most installations under 200kVA).
I doubt there would be enough EE's, or for that matter enough interest in design if small buildings were to require an EE to design.
That said -- a farm could have a lot of rotating equipment, standby generator etc, could get complicated pretty quickly, regardless of overall service size.  I need to think about this a little more!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.