INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

High Point Load on Roof Deck

High Point Load on Roof Deck

High Point Load on Roof Deck

(OP)
We have a situation where high point loads have to be supported by roof deck. I am proposing number of steel members but it looks crouded. Is it possible for roof deck to support point load of 4000 lbs every 5ft spacing. These are chilled water filled pipes.

Here is link to the pipe support system for idea.

RE: High Point Load on Roof Deck

I doubt that 1.5"  22 ga metal roof deck can support that kind of load.

Why not locate the legs directly over the supporting roof members? If you are running parallel to the supporting members that space your supports to sit directly over the supporting roof members. You still may have to put blocks in the flutes to keep the deck from crushing.

RE: High Point Load on Roof Deck

How about putting a beam that will span with the pipe above the roof?  Maybe put a support somewhere where needed.

Never, but never question engineer's judgement

RE: High Point Load on Roof Deck

(OP)
Thanks.

We can negotiate for prefab pipe support to located at framing member. Only concern is local crushing of steel deck as the base of pipe support is 18"X18" in size and wood blocking can help in this regards below the deck. How to load 18"x18" base. Does rigid insulation can help in this case above the deck.

RE: High Point Load on Roof Deck

You need to cut it through and seal around it.

Never, but never question engineer's judgement

RE: High Point Load on Roof Deck

Or use a non-shrink grout above and under the deck, and above the lower support.  You may need an extra steel plate above the lower supportto support the grout layer.

Still sounds like a lot more work than just adding in the extra steel beams.  

Mike McCann
MMC Engineering

RE: High Point Load on Roof Deck

(OP)
I think it is better to have extra members under each pipe support leg and make things easy. Thanks all for your suggestions.

RE: High Point Load on Roof Deck

Good decision... bigsmile

Mike McCann
MMC Engineering

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources