INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Water Pressure Calculation

Water Pressure Calculation

Water Pressure Calculation

(OP)
Hello everyone.
I know this is HVAC Portal, but many of the consulting engineers design HVAC and Plumbing both.
I hope, I find someone from Las Vegas, who will understand the pain.
City of Las Vegas ask for water calculation on almost every project. I can understand on a new project that we can do water pressure calculations. How about tenant improvements? where no one knows how the building pressure calcluation were performed, no drawings, no data.
As I understand, as a Plumbing / Mechanical engineer, our responsibility is up to 5-feet from the building, but in Las Vegas, meteres are installed 100s of feet from the building and that becomes the responsibility of a civil engineer.
Has anyone came across this issue and how you resolve it?
Do we have to analyze the whole building to find pressure at the tenant's space? City of Las Vegas made me analyze the entire block (fixture units) in order for me to provide pressure at my tenant's space

RE: Water Pressure Calculation

Why did they make you analyze the entire block.  There is probably 1 meter serving your building.  I could see an analysis of the building, but one meter doesn't serve the entire block.

I would call CLV to get the pressure at the intersections on both sides of the site location.  This will give you an idea of the pressure at your meter.  If you don't have any drawing you'll have to do some investigation/estimation regarding the routing and size of pipe from the meter to your location.  Do an Appendix  A calc and show an allocation of fixtures to the other tenants served by the main.  You'll have to estimate this based on tenant use (i.e. restaurant or retail).  Size your pipes according to Appendix A and show this calc on your drawings.  This has worked for me in CLV when doing remodels on existing buildings with no drawings.

If CLV is requiring exact pressure have the owner get a plumber out there to perform a pressure test for your tenant space.  However, if this is a shell building and you are the 1st T.I. this pressure will definitely change as others build out.



 

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources