INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Help with Civil 3D Assemblies

Help with Civil 3D Assemblies

Help with Civil 3D Assemblies

(OP)
I have a specific roadway typical section I need to model using AutoCad Civil 3D 2009 and not real sure on the best way to do this. The problem I'm encountering is in the fill conditions and applying the 1' deep toe ditch.

1) In a cut situation I need a 3:1 cut slope for a minumum depth of 3' and 1' below top of sub-grade and then 3:1 to natural ground

2) In a fill situation I need a 3:1 fill slope to natural ground and IF a 3:1 back slope can be applied, I need a 1' deep toe ditch. So If 3:1 back slope can be applied, I need to go 1' below natural ground with my fill slope. If it can't be applied then the fill slope just simply needs to tie to natural.

3) I also am having trouble or a case of ignorance on how to apply a different sub-grade slope than that of the surface.

Thanks for you help!

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources