Boring under a creek
Boring under a creek
(OP)
I am reviewing a set of plans that involve an 8" water line that is being placed under a creek. It is supposed to be bored, not open cut. The thing that is throwing me is that the pipe makes a 90 degree bend directly under the creek. I dont think that is possible with boring, and if it is, I feel it is a bad design...
Is this ok, I am new and figured I would ask here before risking embarrasement since this was deisgned by another engineer at my firm....
Is this ok, I am new and figured I would ask here before risking embarrasement since this was deisgned by another engineer at my firm....





RE: Boring under a creek
Politely inquire to determine if there has been a change in project scope.
RE: Boring under a creek
bimr is right, 'politely' inquire about it...
<<A good friend will bail you out of jail, but a true friend
will be sitting beside you saying " Damn that was fun!" - Unknown>>
RE: Boring under a creek
RE: Boring under a creek
http://virtualpipeline.spaces.msn.com
"What gets us into trouble is not what we don't know, its what we know for sure" - Mark Twain
RE: Boring under a creek
RE: Boring under a creek
http://virtualpipeline.spaces.msn.com
"What gets us into trouble is not what we don't know, its what we know for sure" - Mark Twain