INTELLIGENT WORK FORUMS
FOR ENGINEERING PROFESSIONALS

Log In

Come Join Us!

Are you an
Engineering professional?
Join Eng-Tips Forums!
  • Talk With Other Members
  • Be Notified Of Responses
    To Your Posts
  • Keyword Search
  • One-Click Access To Your
    Favorite Forums
  • Automated Signatures
    On Your Posts
  • Best Of All, It's Free!
  • Students Click Here

*Eng-Tips's functionality depends on members receiving e-mail. By joining you are opting in to receive e-mail.

Posting Guidelines

Promoting, selling, recruiting, coursework and thesis posting is forbidden.

Students Click Here

Jobs

Affect of Minor Project on BFE

Affect of Minor Project on BFE

Affect of Minor Project on BFE

(OP)
Hi All,

I am working on a project where an existing bridge has been built within a mapped floodplain (Zone A). There is no FEMA BFE at this site, but it is clear from other indicators that the bridge is overtopped by up to 10-15 feet during severe storms. The client wants to laterally widen this bridge by 4 feet. Fema guidelines and this County's policies require that alteration of structures in a floodway requires that a civil engineer certify that the alteration will not cause any increase in the base flood elevation (100 year).

This is a small project for a bridge spanning 15 feet (exist. width is 12'). The civil engineer does not want to certify that there will be no increase in BFE without a full hydro study, but the client cannot afford this. Common sense says that a 4' increase (piers will be outside the channel, beyond top-of-bank) will not cause the BFE to rise, but is there another way of proving this without a full hydro study? Maybe assuming flow that overtops the bridge by a foot - if it doesn't make the BFE rise, then higher flows where there is just more water in the floodplain would not make it rise. Is this sound reasoning?

Thank you for reading. Any help is appreciated.

RE: Affect of Minor Project on BFE

There's no way I'd certify that the 100-year floodplain wouldn't increase in such a situation either without a full study.  The only way such a widening wouldn't have an effect was if it was completely masked within the existing blockage of the bridge, and that is unlikely given that a widening will be at some cross slope, and therefore extend above or below the existing bridge.  And even in that case, there are opening effects that would still change the flow characteristics.

I just don't think that a 'common sense' or 'by inspection' analysis is appropriate in this sort of case.
 

RE: Affect of Minor Project on BFE

I don't believe there is any way you will find an engineer to certify this without doing some sort of analysis.  If this is to be accepted by either the County or by FEMA I would be highly surprised if they would accept the certification unless it was backed by an engineering analysis.  However, this doesn't have to be such a big deal. Estimate the flow using regional regression and do a quick HEC-RAS model and you are done.  I would hardly think that this would be a budget buster.

RE: Affect of Minor Project on BFE

If the blockage cross section were made smaller by shrinking the profile of the guard rail or removing sidewalk/curb/median above the road I would certify that no effect on the flow during a flood event.

RE: Affect of Minor Project on BFE

Overtopped by ten to fifteen feet?  How's the bridge holding up?  This sounds like a dubious situation

RE: Affect of Minor Project on BFE

And if there's no FEMA BFE, how can there be a defined FEMA Floodway?

Red Flag This Post

Please let us know here why this post is inappropriate. Reasons such as off-topic, duplicates, flames, illegal, vulgar, or students posting their homework.

Red Flag Submitted

Thank you for helping keep Eng-Tips Forums free from inappropriate posts.
The Eng-Tips staff will check this out and take appropriate action.

Reply To This Thread

Posting in the Eng-Tips forums is a member-only feature.

Click Here to join Eng-Tips and talk with other members!


Resources