HEC RAS output and drafting the floodplain
HEC RAS output and drafting the floodplain
(OP)
I have ineffective areas shown on certain cross sections for my 100 yr boundaries. Would this need to be included while drafting the 100 year floodplain?
thanks
thanks





RE: HEC RAS output and drafting the floodplain